Enterprise Power ERP connects sales, purchasing, inventory, production planning, costing and finance in one database, so manufacturers can run order-to-cash and procure-to-pay on a single record.
Key facts at a glance
- Category
- Enterprise resource planning (ERP), Level 4 of ISA-95
- Primary users
- Sales, purchasing, planning, warehouse and finance teams
- Core scope
- Orders, procurement, inventory, MRP, costing and finance
- Reference model
- ISA-95 / IEC 62264 hierarchy; MRP II planning concepts
- Integrates with
- MES, WMS, SRM, MS7, thermal transfer printers and scanners
What is Enterprise Power ERP?
Enterprise resource planning (ERP) is an integrated software system that runs the core business processes of a manufacturer on one database: sales and order management, purchasing, inventory, production planning, costing and finance. Rather than stitching together spreadsheets and point tools, the ERP maintains a single version of master data and a single record of transactions.
In the ISA-95 / IEC 62264 hierarchy, ERP is the Level 4 business layer. It turns demand into supply plans and hands execution instructions down to manufacturing operations: production orders to MES, material tasks to WMS, and supplier collaboration to SRM. For a manufacturer, the practical test of an ERP is whether it can answer, at any moment, what was ordered, what is in stock, what is in production and what it costs.
Core modules and functions
| Module | What it covers |
|---|---|
| Sales and order management | Quotations, sales orders, pricing, delivery schedules, order status and customer credit limits. |
| Procurement | Purchase requisitions, purchase orders, supplier price lists, delivery tracking and three-way matching. |
| Inventory and stock control | Item master, warehouses, locations, stock movements, lot and serial data, stock valuation. |
| Production planning and MRP | Demand consolidation, material requirements planning, capacity checks, planned and released production orders. |
| Bills of material and routings | Multi-level BOMs, alternates, scrap factors, operations and work-centre definitions. |
| Costing and finance | Standard or average costing, work-in-process, variance analysis, accounts receivable and payable, financial statements. |
| Master data and access control | Material, customer, supplier and pricing masters with role-based permissions and audit trails. |
| Reporting and analytics | Backlog, fill rate, inventory turns, supplier performance, production variance and gross margin. |
Operational problems it addresses
- Fragmented data: sales, purchasing and stock figures live in separate files, so no one trusts the same number.
- Promising dates without capacity: order confirmation is based on habit rather than material and capacity availability.
- Stock that does not match the books: physical counts reveal discrepancies that are written off instead of explained.
- Invisible product cost: material, labour and overhead are reconciled weeks after the month closes.
- Weak audit trail: changes to prices, BOMs and credit limits cannot be traced to a person and a time.
How it works
- Maintain master data: materials, BOMs, routings, customers, suppliers and prices.
- Capture demand from sales orders and forecasts.
- Run MRP to calculate net requirements from stock, open orders and lead times.
- Release purchase orders to suppliers and production orders to MES or the plant.
- Record receipts, issues, production confirmations and stock movements.
- Invoice customers, match supplier invoices and post to the general ledger.
- Review margin, backlog, inventory and supplier performance in standard reports.
Integration with other systems
- MES: receives production orders and returns actual quantities, scrap and quality results.
- WMS: executes physical receipt, put-away, picking and shipping against ERP documents.
- SRM: collaborates with suppliers on RFQs, contracts and purchase order delivery.
- MS7: links serialized unit codes to sales and distribution records for one-item-one-code traceability.
- Identification equipment: printers, scanners and mobile computers read and print the identifiers the ERP depends on.
Implementation phases
| Phase | Main activities | Outputs |
|---|---|---|
| 1. Discovery and process mapping | Map order-to-cash, procure-to-pay and plan-to-produce; agree scope and success measures. | Process map, scope document |
| 2. Master data preparation | Clean and standardize materials, BOMs, customers, suppliers and opening balances. | Validated data set |
| 3. Configuration and integration | Configure modules, roles and interfaces to MES, WMS, SRM and equipment. | Tested system environment |
| 4. Pilot and user training | Run a pilot company or product line; train key users and write work instructions. | Signed-off pilot, trained users |
| 5. Go-live and stabilization | Cut over, monitor transactions daily, fix issues and close the first period. | Live system, first month-end |
Selection checklist
- Does the ERP support multi-company, multi-site and multi-currency structures you may need later?
- How deep can BOMs go, and does it handle alternates, scrap and by-products?
- Which costing method do you use today, and can the system reproduce it?
- Are tax rules and statutory reports localized for your country?
- Which integrations are mandatory on day one: MES, WMS, SRM, bank, e-invoice?
- Can permissions be separated between sales, purchasing, warehouse and finance?
- What is the vendor response time for critical incidents after go-live?
Frequently asked questions
What is the difference between ERP and MES?
ERP plans the business – demand, purchasing, inventory and financials – and is positioned at Level 4 of the ISA-95 hierarchy. MES executes production at Level 3: it schedules work orders, dispatches tasks to workstations, collects shop-floor data and reports actual results back to ERP. In practice, ERP answers “what should we make and what does it cost”, while MES answers “what is happening on the line right now”.
How long does an ERP implementation take?
It depends on scope: the number of sites, modules, data quality and integrations. A phased approach is normal – process mapping and master data first, then configuration and integration, a pilot, and a controlled go-live. MAISUI plans the phases with the customer before configuration starts so that expectations and responsibilities are explicit.
Can existing Excel data be migrated?
Yes, subject to a data audit. Master data (materials, suppliers, customers, bills of material) is usually the largest effort; transactional history is often migrated selectively. The migration scope and validation rules should be agreed before go-live, not after.
Should ERP be on-premise or in the cloud?
Both models are viable. On-premise suits companies with strict data residency rules or existing server operations; private cloud reduces infrastructure effort. The decision should consider integration with MES/WMS, network reliability, backup responsibility and total cost of ownership.
Can ERP support product traceability?
ERP holds lot and serial information at the business-transaction level, which is enough for purchasing and financial traceability. Detailed genealogy – which material went into which unit on which line – is normally captured by MES and, for one-item-one-code requirements, by a serialization layer such as MS7.